Lightning 17 Beginning and End #diy #kayak #fiberglass
1 min read
This #shorts is the beginning and final result of the Lightning 17 build. This video is a quick summary of how the kayak arrived at Timber Boatworks and how it left. The kayak is Mahogany BS 1088 Marine Plywood with West System epoxy with fiberglass. The varnish is Pettit Flagship polyurethane varnish.
Handmade. Adventure Ready.
https://www.timberboatworks.com/collections/touring/products/lightning-17